Repair and temporary dam at Mount Polley Mine near Williams Lake.

Mount Polley design, steep additions led to failure

Glacial layer in dam base not understood, plans to buttress slope put off until weight of water and tailings caused breach

The Mount Polley mine dam failed because of an overlooked glacial material layer in the foundation and a series of steep additions that eventually overcame it, an independent engineering review has concluded.

“Basically the weight of the dam was too much for the weak materials in the foundation to bear,” said U.S. consulting engineer Steven Vick, one of three experts called in to examine the failure that caused the dam to breach and fail in August 2014.

The report concludes that the concrete-like glacial till material in the base of the dam wasn’t understood in enough detail when the dam was designed and built in 1997. Later raising of the dam to hold more water and tailings weakened the base layer and led to the failure.

Vick said the additions to the dam were built at a steeper slope than the original dam, and plans to buttress the area were delayed until it was too late.

Energy and Mines Minister Bill Bennett said the report shows there were no warning signs, and no surface inspections could have detected the problem that was overlooked in the design and original construction.

Two more investigations of the mine failure are pending. Bennett said the Chief Inspector of Mines is likely to release his report by June, and the Conservation Officers’ Service will also report when its investigation is complete.

Bennett said the government is willing to see the Mount Polley mine reopen, but the other investigations must be complete first. The parent company Imperial Metals has applied to use an existing pit to store tailings and resume operations without using the original tailings pond again.

 

Just Posted

Bill passes to make Sept. 30 National Day for Truth and Reconciliation statutory holiday

Residential school survivor Phyllis Webstad and CRD Area F director Joan Sorley were in Ottawa for the vote

Wally Webber elected to fourth term as Nuxalk Chief Councilor

Webber took the win with 174 votes out of a total of 389

Bella Coola expected to be hottest spot in B.C. today

Temperatures are predicted to rise to 18 C

B.C. minister says rural internet is ‘railroad of the 21st century’

Jinny Sims talks details about the $50-million provincial and possible $750-million federal funds

IT’S OFFICIAL: Mt. Timothy sale complete

New owners looking toward year-round mountain resort facility

Sparks fly as SUV speeds down wrong side of Highway 1 trying to flee RCMP

Captured on video, the vehicle headed westbound against oncoming traffic before crashing

Bobrovsky perfect as Blue Jackets blank Canucks 5-0

Vancouver shut out for 10th time this season

Story of Wet’suwet’en Chief Alfred Joseph being told

Song of the Earth on Chief Gisday’wa will be launched in Hagwilget

Houston woman gets two years for aggravated assault

Ewald pleads guilty; trial of co-accused Calvin Dyrland begins in Smithers B.C. court

Fundraising campaign launched for man caught in SilverStar avalanche

In only two days, the GoFundMe surpassed its $15,000 goal

Terror at sea: Helicopter rescues frightened cruise passengers in Norway

The Viking Sky cruise ship was carrying 1,300 passengers and crew when it experienced engine trouble

Search and rescue team helicopters injured climber from B.C. provincial park

A 30-year-old woman suffered a suspected lower-limb fracture in Skaha Bluffs Provincial Park

DOJ: Trump campaign did not co-ordinate with Russia in 2016

Attorney General William Barr said special counsel “does not exonerate” Trump of obstructing justice

Trudeau in Vancouver to support Tamara Taggart at Liberal nomination event

The former broadcaster is seeking the nomination for the Vancouver Kingsway riding

Most Read